av大全亚洲一区二区三区_高清国产亚洲欧洲av综合一区_A级毛片大全免费版特黄色_中文字幕一本到无线

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.